
Dirty Crawl Space
Upon inspection by Specialist Ward Purvis, he discovered that the crawl space was filled with debris.

Bad Repair Work
The cinder block piers are an inferior repair solution, and they do not result in a permanent stabilized floor.

Cinder Block Piers
Dana L.'s cinder block piers were a previous attempt to fix the settlement issues.

Adjustable SmartJack
Our SmartJack System are made out of strong, galvanized steel, and they are fully adjustable according to the customer's needs.

Supplemental Beam
The supplemental beam distributes the load over our SmartJack System resulting in a controlled even lift.